Faster rural broadband rollout 'not quick enough'
For photographer Lisa Daniels, the rollout of faster broadband to thousands of people in rural areas of Derbyshire could not come soon enough.
Project Gigabit is the government's programme to enable hard-to-reach communities to access "lightning-fast" gigabit-capable broadband.
The rollout has reached halfway, with 6,600 homes and businesses already connected in the county, said the Department for Digital, Culture, Media and Sport (DCMS).
Daniels, who lives in the Peak District village of Edale, said the government had been promising for a long time that it would cover small pockets of isolated areas with little internet, but it was "not fulfilling its promise quick enough".
Daniels said she had resorted to paying £70 a month to use Starlink, operated by Elon Musk's SpaceX, which provides high-speed internet.
She has had to work from cafes in nearby towns because it was "taking days" to upload photos to her clients.
"We were running two broadband systems at once, which were getting about 13 Mbps. It was dreadful, was absolutely impossible to work and we couldn't afford to run both at the same time," she added.
"I don't want to use Starlink, and I would much rather the government provide me with something that I can actually work with. I just feel penalised for living rurally."
DCMS said broadband provider Connect Fibre had connected 6,600 premises across Derbyshire so far to broadband speeds of up to 5,000 megabits per second (Mbps). A further 6,200 premises are due to be connected, bringing the total to 12,800.
"Better connectivity" would mean rural residents and businesses in Bakewell and beyond could now "download 47 HD films in the time it takes to bake one of its famous puddings", it added.
Alsop en le Dale, Clay Cross, Earl Sterndale, Hulland Ward, Newton Solney and Thulston, as well as smaller surrounding hamlets in Derbyshire have also been connected, it said.
Robert Griffiths, from Beeley, near Matlock, said he was yet to receive the government-funded broadband upgrade and said watching television could be "impossible" despite paying £77 a month to two broadband providers.
"If I turn on the six o'clock news, within five minutes it stops, presumably because there isn't enough bandwidth for everyone watching the news," said Griffiths.
"Although I'm retired, I use the internet quite a lot. It's difficult to upload material because it's so slow. Watching TV is sometimes impossible. And so for me, it impacts me all the time."
Griffiths thinks broadband should be "treated exactly the same as a utility".
"I'm surprised that in these days, it hasn't already been considered to be a utility. I don't think one could live a modern life without it," he said.
"I think it's a necessity that the government carry on rolling out the scheme. If they do stop rolling it out, they ought to subsidise to some extent the cost of having fast broadband delivered by satellite or other means."
Telecoms Minister Ian Murray said he wanted to make sure "99% of the entirety of the UK was connected by 2032".
"We've been rolling this out as quickly as possible and it's a real success story because we need to make sure that we are connecting up every single premise in the country, whether you're remote, whether you're in the cities or whether you just don't have the connectivity at this moment in time.
"We're as impatient as they are to get this connected, we want to make sure that the whole country is connected by 2032, we're trying to do it as quickly as we possibly can."
Listen to BBC Radio Derby on Sounds and follow BBC Derby on Facebook ↗, on X ↗, or on Instagram ↗. Send your story ideas to eastmidsnews@bbc.co.uk ↗ or via WhatsApp ↗ on 0808 100 2210.